The port was officially put into operation and used since 2002 to serve the function of loading, transporting all the goods and equipment for the construction of the Dung Quat oil refinery – the first oil refinery of Vietnam.

Warehouse

  • Warehouse: 3,600M2
  • Port yard: 50,000M2
  • Service grounds area: 80,000 M2
  • Factory: 2,000M2
  • Warehouse: M2

Lifting and transporting equipment

  • Crawler crane 150T: 01
  • Crawler Crane 90T: 01
  • Crane 70T: 01
  • Gantry crane 50T: 02
  • 25t wheel cranes: 02
  • Crane 10T: 02
  • Forklift 15T: 01
  • Forklift 5-7T: 02
  • 2.5T Forklift: 04
  • 80T Dwarf trailers: 01
  • Super long trailer 80T: 01
  • Tractors: 20
  • Dump truck: 20
  • Small truck: 04

Fleet

  • AHT 4,750BHP: 01
  • AHT 3,500BHP ship: 01
  • Tugboat 2,800BHP: 02
  • Tugboat of 500-1000BHP: 04